§ 01 — Since 2005

Production lines built to outlast their warranty.

Dairy, juice, beverage and brewing equipment engineered, fabricated and commissioned out of Shanghai. 600+ lines delivered to 80+ countries — and still running.

HTK CIP System — engineered in Shanghai
Featured · CIP UT-01
20+
Years Engineering
600+
Lines Delivered
80+
Countries Served
12M
Months Warranty
CE Certified·ISO 9001:2015·EHEDG Compliant·SUS 304 / 316L·FDA Material·3-A Sanitary·SIEMENS PLC·Schneider Electric· CE Certified·ISO 9001:2015·EHEDG Compliant·SUS 304 / 316L·FDA Material·3-A Sanitary·SIEMENS PLC·Schneider Electric·
§ 02 — Industries

Four verticals, one engineering team.

All Solutions
§ 03 — Featured Equipment

Hot-running models — picked from 55+ in our catalogue.

View All Products
§ 04 — Why HTK

Six reasons buyers in 80 countries keep coming back.

01 / Fabrication

In-house manufacturing

12,000 m² Shanghai facility. Cutting, rolling, welding, polishing, assembly and testing — all under one roof, no outsourcing of critical parts.

02 / Compliance

Audited certifications

CE, ISO 9001:2015, EHEDG hygienic design, 3-A sanitary standard. Material traceability with mill certificates available on request.

03 / Performance

Throughput guaranteed

Capacity is contracted, not estimated. We test at our facility before shipping, and again on-site at commissioning.

04 / Commissioning

Global installation

Engineers fly to your site for installation, commissioning and operator training. Africa, MENA, LATAM, SE Asia — we have travel logistics dialed in.

05 / Lead Time

12-month warranty

Standard one-year warranty on all manufactured equipment. Extended service contracts available for production-critical lines.

06 / After-sale

Lifetime spare parts

We stock wear parts and tooling for every machine we've ever built. Air-freight available 24/7 for production-down emergencies.

§ 05 — How We Work

From inquiry to first production run — 90 to 180 days.

Step 01
Inquiry

You share product type, capacity, voltage and timeline. We respond inside 24 h.

Step 02
Quote

Sized line layout, equipment list, FOB/CIF pricing. Drawings on deposit.

Step 03
Build

60–120 days fabrication. Weekly photos. Factory acceptance test before ship.

Step 04
Ship

Crating, customs, port-to-port. CIF or DAP terms available.

Step 05
Commission

On-site install, run-in production, operator training, signed handover.

§ Customer Voice

"The 5,000 L/h yogurt line we bought from HTK in 2019 has been running 18 hours a day, six days a week, with zero major faults. Wear parts arrive in Lagos before we even need them."

A
Adekunle O.
Plant Manager · Lagos, Nigeria
Performance Snapshot
  • Avg. quote turnaround2.3 days
  • On-time shipping rate96.4 %
  • First-year defect rate< 1.2 %
  • Repeat customer rate68 %
  • Avg. line uptime (Y1)98.7 %
§ FAQ

Most-asked, answered.

What's the typical lead time for a complete production line?

For standard equipment 60–90 days; turnkey lines 120–180 days depending on capacity and customization. Air-freight expedite available at extra cost.

Do you provide on-site installation and commissioning?

Yes — included in the contract. Our engineers fly to your site, supervise installation, run trial production, and train your operators. Travel cost depends on country.

What materials do you use for product-contact parts?

SUS 316L for product-contact surfaces, SUS 304 for non-contact. All material conforms to FDA standards; mill certificates supplied with shipment.

Can you customize equipment to our voltage and process?

Yes. We support 220 V / 380 V / 415 V / 440 V at 50 or 60 Hz, and customize tank volumes, pipe sizes, and PLC logic to your line layout and product spec.

What payment terms do you accept?

Standard: 30 % deposit by T/T, 70 % balance against B/L copy after factory acceptance test. L/C at sight available for orders above 100 k USD.

What warranty do you offer?

12 months from commissioning date for all manufactured parts (excluding consumables and wear items). Extended service contracts available.

§ Next Step

Tell us what you're producing — we'll size the line.

Most quotes go out within one business day. WhatsApp is fastest.